09:07 AM EDT, 05/28/2024 (MT Newswires) -- Bedford Metals ( URGYF ) outlined Tuesday its plan for a multi-phase work program at the Ubiquity Lake uranium project in Saskatchewan.
The first phase includes an airborne survey aimed at further identifying subsurface features such as faults and folds, which may be controls of historic radioactive anomalies, The second phase involves a comprehensive ground program that includes field mapping, soil sampling and a systematic ground radiometric survey to identify new and historic anomalies.
"We are excited about the potential of this project and look forward to advancing it through the proposed work program," said Peter Born, Bedford's president.