financetom
Business
financetom
/
Business
/
As demand for US LNG booms, one plant struggles to stay online
News World Market Environment Technology Personal Finance Politics Retail Business Economy Cryptocurrency Forex Stocks Market Commodities
As demand for US LNG booms, one plant struggles to stay online
Apr 25, 2024 3:25 PM

HOUSTON (Reuters) - The second-largest U.S. liquefied natural gas (LNG) export facility has been running below 80% of its capacity due to technical problems, data from financial firm LSEG showed, denting U.S. exports.

Since Jan. 15, Freeport LNG's Quintana, Texas, liquefaction plant has been operating without at least one of its three gas-processing trains. In the last two weeks, it has taken barely enough gas for one of its trains to fully operate.

On Thursday, it took in 61 million cubic feet (mcf) of gas, compared to its capacity for 2.2 billion cubic feet per day (bcfd), LSEG data showed.

A Freeport LNG spokesperson declined to comment.

The company has blamed a January freeze for damage to its Train 3 motors, and in March said it had taken proactive steps to inspect and would take two other trains offline for servicing.

"Future LNG projects will want to study what went wrong with Freeport's design," Ira Joseph, a senior research associate at Columbia University's Center on Global Energy Policy, said on social media site X.

The plant's "lack of reliability is really sending Henry Hub (U.S. natural gas futures) for a wild ride," wrote Joseph.

Henry Hub prices have fallen from $2.90 per million cubic feet (mmcf) on Jan. 16 to $1.63 per mmcf on Thursday.

Freeport's operating woes were evident even before a 2022 fire knocked its facility offline for months and appear to have worsened after the plant returned to service last year, according to the LSEG data.

In the 365 days up to the June 7, 2022, fire, Freeport's average utilization rate was 1.820 bcfd or 80% of its maximum 2.2 bcfd capacity. In the last 12 months that rate has fallen to an average of 1.625 bcfd or 72% of maximum flow rate.

The Quintana plant has had the lowest gas utilization rate in the U.S., behind Venture Global LNG's Calcasieu Pass, Louisiana, plant with its 80% utilization rate while undergoing commissioning, the LSEG data shows.

Other U.S. LNG plants are operating at an average 85-87% capacity, LSEG data shows.

Comments
Welcome to financetom comments! Please keep conversations courteous and on-topic. To fosterproductive and respectful conversations, you may see comments from our Community Managers.
Sign up to post
Sort by
Show More Comments
Related Articles >
Suzlon's S144–3 MW wind turbines get big boost from Indian government
Suzlon's S144–3 MW wind turbines get big boost from Indian government
Nov 15, 2023
Th Suzlon wind turbines received the RLMM (Revised List of Models & Manufacturers) listing from the Ministry of New and Renewable Energy, marking an important milestone for the successful commercialisation of the product. Shares of Suzlon Energy Ltd ended at ₹40.49, up by ₹1.85, or 4.79%, on the BSE.
SJVN secures 200-MW wind power project at ₹3.24 per unit
SJVN secures 200-MW wind power project at ₹3.24 per unit
Nov 16, 2023
Projected to generate 482 million units in its inaugural year post-commissioning, the cumulative energy generation over a 25-year span is anticipated to reach 12,050 million units. Shares of SJVN Ltd ended at ₹75.17, down by ₹0.50, or 0.66%, on the BSE.
Tata Power Renewable Energy wins 200-MW project in collaboration with SJVN
Tata Power Renewable Energy wins 200-MW project in collaboration with SJVN
Nov 28, 2023
The firm and dispatchable renewable energy (FDRE) project, designed with a hybrid of solar, wind, and battery storage, is aimed at providing a stable and dispatchable energy supply during peak hours. Shares of Tata Power Company Ltd ended at ₹270.75, up by ₹12.60, or 4.88%, on the BSE.
This sustainable jewellery brand is luring some women away from gold
This sustainable jewellery brand is luring some women away from gold
Oct 30, 2023
Aulerth's offerings range from ₹5,000 to as high as ₹2.8 lakh. Are women willing to spend this much on jewellery made from scrap? Founder and CEO Vivek Ramabhadran definitely believes so. Aulerth produces couture-inspired pieces in association with designers like JJ Valaya, Suneet Varma, among others. It has reported 33% repeat customers in the past year and expects a spike to 40% soon.
Copyright 2023-2026 - www.financetom.com All Rights Reserved