06:54 AM EST, 11/12/2025 (MT Newswires) -- Liberty Gold ( LGDTF ) announced Wednesday the formal commencement of Feasibility Study engineering for its flagship Black Pine Oxide Gold Project in southeastern Idaho.
Following the completion of the Preliminary Feasibility Study in October 2024, Liberty Gold ( LGDTF ) said it has assembled a "highly experienced and integrated engineering team" to advance the project through the FS phase.
"We are excited to move into the feasibility engineering phase for Black Pine," said Liberty Gold's ( LGDTF ) President and Chief Executive Officer, Jon Gilligan. "Continuing with much of the same technical team that delivered the PFS provides consistency, efficiency, and confidence as we advance the Feasibility Study. With a strong technical foundation, a highly experienced and capable in-house Owner's team and a solid funding position, Liberty Gold ( LGDTF ) is well-positioned to deliver the Feasibility Study in early Q4 2026 and move decisively toward construction readiness."