08:15 AM EDT, 10/07/2024 (MT Newswires) -- Power Metals ( PWRMF ) on Monday announced high-grade cesium and lithium results from the first round of exploration drillhole assays from the summer 2024 drill program at its Case Lake Project in Ontario. The drill program targeted West Joe and Main Zone areas at the project.
Exploration drilling at West Joe has continued to intercept shallow high-grade mineralization up to 22.58% Cs2O (cesium oxide) hosted in pollucite. The first three exploration holes also intersected consistent high-grade cesium characterized by pollucite mineralization in 5.7 to 8.7 meters thick pegmatites at West Joe, the company said.
Due to the positive results, Power has planned for an additional 2,500 meters of drilling once remaining assays have been received.