financetom
Business
financetom
/
Business
/
Titan Mining Announces Phase III Metallurgy Results From Kilbourne Graphite Project
News World Market Environment Technology Personal Finance Politics Retail Business Economy Cryptocurrency Forex Stocks Market Commodities
Titan Mining Announces Phase III Metallurgy Results From Kilbourne Graphite Project
Jan 16, 2025 5:04 AM

07:42 AM EST, 01/16/2025 (MT Newswires) -- Titan Mining ( TIMCF ) on Thursday said Phase III metallurgy results for the Kilbourne graphite project yielded final concentrate of 98.8% total carbon and saleable product.

Size fraction analysis of the final concentrates also showed good flake size distribution with the potential to deliver to available U.S. domestic segments and value-added products, Titan added.

The company is also completing engineering for the processing facility for Kilbourne natural graphite, at Empire State Mines (ESM) in New York state. The facility is expected to produce 1,000-1,200t per annum of graphite concentrate and aims for modular expansion to baseline production of 40,000t per annum with further growth capability.

The aim is to fast-track development of Kilbourne and make ESM the first end to end producer of natural flake graphite in the U.S. since the 1950s, a statement said.

"The current resource outlined at Kilbourne represents only 8,300 ft of strike length tested of a total strike length of 25,000 ft. Kilbourne has significant resource expansion potential to meet the demands of US natural flake graphite over a long- term period and we are excited to be moving towards the next phase of development," said Don Taylor, CEO of Titan.

Comments
Welcome to financetom comments! Please keep conversations courteous and on-topic. To fosterproductive and respectful conversations, you may see comments from our Community Managers.
Sign up to post
Sort by
Show More Comments
Related Articles >
Suzlon's S144–3 MW wind turbines get big boost from Indian government
Suzlon's S144–3 MW wind turbines get big boost from Indian government
Nov 15, 2023
Th Suzlon wind turbines received the RLMM (Revised List of Models & Manufacturers) listing from the Ministry of New and Renewable Energy, marking an important milestone for the successful commercialisation of the product. Shares of Suzlon Energy Ltd ended at ₹40.49, up by ₹1.85, or 4.79%, on the BSE.
SJVN secures 200-MW wind power project at ₹3.24 per unit
SJVN secures 200-MW wind power project at ₹3.24 per unit
Nov 16, 2023
Projected to generate 482 million units in its inaugural year post-commissioning, the cumulative energy generation over a 25-year span is anticipated to reach 12,050 million units. Shares of SJVN Ltd ended at ₹75.17, down by ₹0.50, or 0.66%, on the BSE.
This sustainable jewellery brand is luring some women away from gold
This sustainable jewellery brand is luring some women away from gold
Oct 30, 2023
Aulerth's offerings range from ₹5,000 to as high as ₹2.8 lakh. Are women willing to spend this much on jewellery made from scrap? Founder and CEO Vivek Ramabhadran definitely believes so. Aulerth produces couture-inspired pieces in association with designers like JJ Valaya, Suneet Varma, among others. It has reported 33% repeat customers in the past year and expects a spike to 40% soon.
Tata Power Renewable Energy wins 200-MW project in collaboration with SJVN
Tata Power Renewable Energy wins 200-MW project in collaboration with SJVN
Nov 28, 2023
The firm and dispatchable renewable energy (FDRE) project, designed with a hybrid of solar, wind, and battery storage, is aimed at providing a stable and dispatchable energy supply during peak hours. Shares of Tata Power Company Ltd ended at ₹270.75, up by ₹12.60, or 4.88%, on the BSE.
Copyright 2023-2026 - www.financetom.com All Rights Reserved