financetom
Economy
financetom
/
Economy
/
Cabinet clears Rs 10,000 crore FAME II scheme
News World Market Environment Technology Personal Finance Politics Retail Business Economy Cryptocurrency Forex Stocks Market Commodities
Cabinet clears Rs 10,000 crore FAME II scheme
Feb 28, 2019 1:30 PM

With an eye on promoting electric and hybrid vehicles, union finance minister Arun Jaitley said Thursday that the union cabinet has cleared a Rs 10,000-crore programme under the FAME-II scheme.

Share Market Live

NSE

The scheme will be implemented over a period of three years with effect from April 1, 2019. It is the expanded version of the present scheme FAME India I (Faster Adoption and Manufacturing of (Hybrid) and Electric Vehicles (FAME) which was launched on April 1, 2015, with a total outlay of Rs 895 crore, an official statement said.

The main objective of the scheme is to encourage faster adoption of electric and hybrid vehicles by way of offering an upfront incentive on the purchase of electric vehicles and also by way of establishing necessary charging infrastructure for EV, Jaitley told reporters in New Delhi.

The emphasis will be on electrification of public transport that includes shared transport, demand incentives on operational expenditure mode for electric buses will be delivered through state/city transport corporations (STUs), the statement said.

In three-wheeler and four-wheeler segments, incentives will be applicable mainly on vehicles used for public transport or registered commercial purposes, it said.

In the two-wheeler segment, the focus will be on private vehicles. "Through the scheme, it is planned to support 10 lakh electric two-wheelers, five lakh three-wheelers, 55,000 four-wheelers and 7,000 buses," the statement said.

The scheme will help in addressing the issue of environmental pollution and fuel security.

In order to encourage advance technologies, the benefits of the incentives will be extended to only those vehicles which are fitted with an advanced battery like lithium-ion battery and other new technology batteries.

The scheme also proposes support for setting up of charging infrastructure whereby about 2,700 charging stations will be set up in metros, other million-plus cities, smart cities and cities of hilly states across India, the statement added. The plan is to ensure availability of at least one charging station in a grid of 3km x 3km, it added.

The establishment of charging stations are also proposed on major highways connecting major city clusters. On such highways, charging stations will be established on both sides of the road at an interval of about 25 km each, it said.

The much-delayed FAME II was revamped by the expenditure of the finance committee in a meeting held Monday. Initially, in August last year, an inter-ministerial panel had finalised the roadmap for Faster Adoption and Manufacturing of (Hybrid) and Electric Vehicles (FAME) II scheme with an outlay of around Rs 5,500 crore spanning over five years and subsidy support for all types of electric vehicles.

However, later on in November the government had extended the phase-I FAME scheme till March 2019 or till a notification for the second phase. The ministry of finance had approved enhancement of the total outlay for the first phase of the scheme from Rs 795 crore to Rs 895 crore.

The scheme was supposed to be implemented over a two-year period commencing April 1, 2015. It was to be followed by the rollout of the second phase. The first phase was extended four times for six months each.

First Published:Feb 28, 2019 10:30 PM IST

Comments
Welcome to financetom comments! Please keep conversations courteous and on-topic. To fosterproductive and respectful conversations, you may see comments from our Community Managers.
Sign up to post
Sort by
Show More Comments
Related Articles >
Zoomed Out | Critical Minerals — why India's current strategy to become self-reliant is so vital
Zoomed Out | Critical Minerals — why India's current strategy to become self-reliant is so vital
Nov 29, 2023
Internationally, there are genuine security concerns related to the criticality in building more diverse and dependable value chains for critical minerals, about their environmental and social sustainability, and technological challenges. While, India has taken the right steps for creating an ecosystem for accelerated exploration and production of critical and new age minerals, observes FICCI Mining Committee Co-Chair Pankaj Satija.
JPMorgan has a new way to gauge its green progress
JPMorgan has a new way to gauge its green progress
Nov 15, 2023
As the largest energy banker, JPMorgan is a frequent target of criticism over Wall Street’s role in the climate crisis. At the same time, the bank is a leading US arranger of green bonds, making it vulnerable to Republicans seeking to protect the fossil fuel industry.
India looking into 'freak' incidents like damage to Sikkim's Chungthang dam: RK Singh
India looking into 'freak' incidents like damage to Sikkim's Chungthang dam: RK Singh
Oct 18, 2023
Stressing on the need to have quick ramp up and ramp down energy sources for grid balancing, the minister described hydroelectric power's role as essential in the path to energy transition as wind energy is intermittent and the sun doesn't shine 24×7.
In fight to curb climate change, a grim report shows world is struggling to get on track
In fight to curb climate change, a grim report shows world is struggling to get on track
Nov 14, 2023
The State of Climate Action report released on Tuesday by the World Resources Institute, Climate Action Tracker, the Bezos Earth Fund and others looks at what's needed in several sectors of the global economy power, transportation, buildings, industry, finance and forestry to fit in a world that limits warming to 1.5 degrees Celsius (2.7 degrees Fahrenheit) over pre-industrial times, the goal the world adopted at Paris in 2015. The globe has already warmed about 1.2 degrees Celsius (2.2 degrees Fahrenheit) since the mid-19th century.
Copyright 2023-2026 - www.financetom.com All Rights Reserved